Project: Design, production, supply, installation and commissioning inverter for propeller of 888 vessel
Year of Implementation: 2020
Location: Marine surveying and charting team/Navy General Staff – Hai Phong, Viet Nam
Project: Design, production, supply, installation and commissioning inverter for propeller of 888 vessel
Year of Implementation: 2020
Location: Marine surveying and charting team/Navy General Staff – Hai Phong, Viet Nam
Project: Design, supply and installation of electrical control system for 03 RTG cranes at Chu…
Project: Design, supply and installation of inverter 900 Kw for Coal Mill Fans and 548…
Project: Design, supply and installation of MV, LV, MV VFD, MV SST cabinet systems and…
Project: Design, supply and installation of MV, LV cabinet system for ASU LOX 6.0 project,…
Project: Design, supply and installation of Solcon medium-voltage soft starter system; MCC 0.4KV 6300A 100kA…
Project: Supply, installation and technical services to replace and upgrade the DCS system - Vicem…
Project: Supply and installation of 04 belt weighing systems for the mixing area and sintering…
Project: Suppy, enhance, install high-temperature furnace camera systems at Nghi Son Thermal Power Plant Year of…
Project: EPC general contractor supplies, installs, and designs a solar energy system with an installed…
Project: Overhaul the coal conveyor weighing system at Duyen Hai thermal power plant Year of…
Project: Supply and installation of MV Siemens inverters at Chinfon Hai Phong Cement Factory Year…
Project: Supply, construction and installation of outdoor lighting electrical system and control electrical system connecting…
Project: Supply and install Siemens medium voltage inverter system to control DC1 cement grinding fan…
Project: Upgrading, replacing, programming DCS control system for Cement mill & Jetti line from DCS…
Design, supply and install medium voltage inverter system for 9.6MV motor – Messer Thai Nguyen…
Supply and install expansion IO cabinets for DCS system - Nui Phao Thai Nguyen mine…
Supply and install conveyor weighing system BW500 - Nghi Son Thermal Power Plant - 2022
Inspection Service for coal mill performed by experts from Metso Outotec – Pha Lai Thermal…
Design, supply and install pneumatic control PLC cabinet for blasting machine at Hoa Phat Dung…
Design, supply and install 02 inverter systems S120-315kW - Hoa Phat Hai Duong Steel Joint…