X

Control cabinet for boiler system – Phu My 3 thermal power company

Design, supply and install control cabinet for boiler system – Phu My 3 thermal power…

haianhjsc

(Tiếng Việt) TUYỂN GẤP 02 NHÂN VIÊN KINH DOANH LÀM VIỆC Ở HÀ NỘI HOẶC TP HCM

Sorry, this entry is only available in Vietnamese.

haianhjsc

Online coal parameter monitoring system at Vinh Tan 2 Thermal Power Plant

Project: Supply and install an online coal parameter monitoring system at Vinh Tan 2 Thermal…

haianhjsc

MDB power supply cabinet system – BARIA SERECE Joint Stock Company of services for import export of argo forestry products and fertilizers

Project name:  Supply and install, electrical connection for MDB power supply cabinet system - BARIA…

haianhjsc

Equipment for improving the flaps of the Stacker Reclaimer at Vinh Tan 2 Thermal Power Plant

Project name: Supply and installation of equipment to improve the flip of Stacker Reclaimer at…

haianhjsc

Automatic residue weighing system (conveyor scale), SCADA at An Khe Biomass Power Plant

Project name: Supply and installation of automatic residue weighing system (conveyor scale) and SCADA monitoring…

haianhjsc

Solcon soft starter cabinet 6kW – 140A at Khanh Hoa Coal Company

Project name: Supply and install 2 Solcon 6kW - 140A soft starter cabinets at Khanh…

haianhjsc

Conveyor weighing system C4C, SCADA at Vinh Tan 2 Thermal Power Plant

Project name: Supply and install C4C conveyor weighing system and upgrade SCADA system, update C4C…

haianhjsc

(Tiếng Việt) Tuyển dụng Kỹ sư Tự động hóa và Kỹ sư Cơ điện – Tháng 12 – 2021

Sorry, this entry is only available in Vietnamese.

haianhjsc

(Tiếng Việt) Tuyển dụng Nhân viên kinh doanh – T9 2021

Sorry, this entry is only available in Vietnamese.

haianhjsc

Hai Anh JSC sponsors drugs to support Covid-19 treatment in Quang Binh province

On September 13, 2021, at the office of the People's Committee of Quang Binh province,…

haianhjsc

(Tiếng Việt) Tuyển dụng T8 2021 – Kỹ sư Điện Tự động hóa – 2 người làm việc tại Hà Nội

Sorry, this entry is only available in Vietnamese.

haianhjsc

Hai Anh – Quang Tri Wind Power Plant signed a commitment to environmental protection

Implement Directive No. 45/CT-TTg dated January 31, 2020 of the Prime Minister on the Program…

haianhjsc

Successfully implemented online factory acceptance test (Online FAT) for the project: Supply, design, install control system for water supply and drainage system and HVAC at Long Son petrochemical complex

In the complicated situation of the COVID-19 pandemic, in the spirit of determination to meet…

haianhjsc