Inverter systems S120-315kW – Hoa Phat Hai Duong Steel Joint Stock Company

Design, supply and install 02 inverter systems S120-315kW - Hoa Phat Hai Duong Steel Joint…

haianhjsc

Medium voltage inverter cabinets for fans at Song Lam Cement plant

Design, supply and install medium voltage inverter cabinets 1000kW for fans at Song Lam Cement…

haianhjsc

(Tiếng Việt) Tuyển dụng Trợ lý quản lý dự án – làm việc tại văn phòng Hà Nội

Sorry, this entry is only available in Vietnamese.

haianhjsc

Siemens Digital Industries Vietnam Partner Conference 2022

On 27th - 29th of October, 2022, Hai Anh JSC attended Siemens Digital Industries Vietnam…

haianhjsc

Welcome Flender’s representative at Hai Anh factory

In this August, Hai Anh JSC was pleased to welcome Flender's representatives, Mr. Klaus Kemper…

haianhjsc

Meet the representative of RTI – Real Time Instrument

RTI is an Australian based company specialising in warehouse management; on-line elemental and moisture analysis…

admin

(Tiếng Việt) Tuyển dụng Kỹ sư Điện – TĐH

Sorry, this entry is only available in Vietnamese.

haianhjsc

(Tiếng Việt) Tuyển Kỹ sư bán hàng làm việc tại Chi nhánh miền Trung – Thanh Hóa

Sorry, this entry is only available in Vietnamese.

haianhjsc

Meet the representative of Metso Outotec at Nova Energy High-tech Research and Production Center

Metso Outotec is a multinational company with headquarters in Finland. It is a frontrunner in sustainable…

haianhjsc

2022 summer vacation

On July 1-3, Hai Anh organized a fun and meaningful summer vacation for all officers,…

haianhjsc

Meet the representative of DuragGroup at Nova Energy High-tech Research and Production Center

DuragGroup is a global corporation from Germany with more than 70 years of specialized experience…

haianhjsc

Soft starter system for air compressors at Messer Thai Nguyen Industrial gases Co. Ltd

Project: Supply and install 03 MV soft-starter cabinets for air compressors – Messer Thai Nguyen…

haianhjsc

Soft starter system for Messer Dung Quat Industrial gases Co. Ltd

Project: Supplying and install a soft starter system including 01 10KV - 600A  KDM cabinet…

haianhjsc

WH7 Loading in site control cabinet for Baria Serece port

Project: Supply and installation of Mechanical drives and WH7 Loading in site control cabinet for…

haianhjsc