Project name: Supply and installation of power and control system for Screening-Separation cluster for Lep My coal screening plant
Implementation time: 2018
Design, supply and operate Screening and Separation systems including:
- Operation station at the control house of 1.5 million tons/year screen cluster (Floor +21)
- Control cabinet DK 2 at the 1.5 million tons/year screen cluster
- Control cabinet DK 3 at the conveyor control house B800x380m, floor +21
- Control station and data collection of RTU01 conveyor at the conveyor control house B1000x915m, floor +30.
- Siemens controller: S7-300, S7-1200.
- Communication connection standard: Profinet.
- Monitoring and control interface WinCC V14 Professional–SP1.