Electrical control system for 03 RTG cranes at Chu Lai Port
Project: Design, supply and installation of electrical control system for 03 RTG cranes at Chu Lai Port – Quang Nam Implementation year: 2024
Project: Design, supply and installation of electrical control system for 03 RTG cranes at Chu Lai Port – Quang Nam Implementation year: 2024
On October 8th, the Vietnam Automation Association solemnly celebrated its 30th anniversary. In the festive atmosphere of the event, Mr. Quan Duy Hai – General Director of Hai Anh JSC extended sincere congratulations to the Association’s leadership and all members. The past 30 years have been a meaningful journey for the Vietnam Automation Association. With […]
After the historic Yagi storm, the North of Vietnam is still recovering from the severe consequences. In particular, schools in mountainous areas like Lao Cai are ready to welcome students back, but difficulties in terms of facilities remain. Understanding the losses and hardships faced by the local people, with the spirit of “helping one another”, […]
Nova Energy proudly showcased and introduced the intelligent, safe, and efficient electric vehicle charging solution NVCharge at the Innovate Vietnam 2024 and the 5th anniversary of the National Innovation Center (NIC) organized by the Ministry of Planning and Investment on October 1-2 at the National Innovation Center (NIC), Hoa Lac Hi-Tech Park, Hanoi. The event was […]
On September 13, 2024, Hai Anh was proud to be one of the main sponsors of the 2023-2024 Sugarcane Summary Conference and the Vietnam Sugarcane Competitiveness Enhancement Workshop, organized by the Vietnam Sugarcane Association at Hall 23-3, An Khe Commune, Gia Lai Province. The event gathered a large number of member enterprises, state management agencies […]
Sorry, this entry is only available in Vietnamese.
Project: Design, supply and installation of inverter 900 Kw for Coal Mill Fans and 548 Kw for Cooler Fans at Chinfon Cement Company – Hai Phong year of implementation: 2024
Project: Design, supply and installation of MV, LV, MV VFD, MV SST cabinet systems and Transformers 12/16MVA và 2500KVA for the Air Separation Plant (ASU Song Cong) – Messer Hai Phong Industrial Gas Co., Ltd. Year of implementation: 2024
Project: Design, supply and installation of MV, LV cabinet system for ASU LOX 6.0 project, Messer Hai Duong Plant Year of implementation: 2024
After a period of hard work, all Hai Anh JSC staff enjoyed a wonderful summer trip together at Flamingo Cat Ba beach resort for 3 days from July 26 to 28, 2024. This is a time for us to temporarily leave behind the hustle and bustle of work, explore the natural beauty of the country, […]
Sorry, this entry is only available in Vietnamese.
Sorry, this entry is only available in Vietnamese.
Sorry, this entry is only available in Vietnamese.
Project: Supply, installation and technical services to replace and upgrade the DCS system – Vicem Song Thao Cement Joint Stock Company. Year of implementation: 2024
© Copyright 2003-2022 - Công ty CP TMKT Hải Anh - Hai Anh JSC, Địa chỉ: P301, Nhà D5C, đường Trần Thái Tông, Q.Cầu Giấy, TP. Hà Nội, Việt Nam | ĐT: (+84-24) 6269 7755 | Fax: (+84-24) 6269 5556