TYPICAL PROJECTS

External Network Metering System – Hoa Phat Dung Quat 2 Project

Project: Design, supply, and installation of the External Network Metering System – Hoa Phat Dung Quat 2 Project Year of implementation:

Medium Voltage Switchgear System at Hoang Mai Cement

Project: Design, supply, and installation of medium voltage switchgear system at VICEM Hoang Mai Cement Joint Stock Company Year of implementation:

Electrical and Control System for HPS2 Phong Dien Plant

Project: Design, supply, and installation of the electrical and control system at HPS2 Phong Dien plant (Hue) Year of implementation: 2025

Compressed Air Station Electrical System – Hoa Phat Dung Quat 1 Thermal Power Plant

Project: Design, supply, and installation of the expanded compressed air station electrical system at Hoa Phat Dung Quat 1 Thermal

Impurity separation system – Vinh Tan 4 Thermal Power Plant

Project: Supply and installation of impurity separation system at JT-02 tower at Vinh Tan 4 Thermal Power Plant Completion year: 2025

Control system for marine engines

Project: Supply and installation of Cummins KTA50-M2 engine control system for marine vessels Completion year: 2025

Inverter for coal grinding and material grinding fan system at Chinfon Cement Plant

Project: Supply and installation of medium voltage inverter for coal grinding and material grinding fan system at Chinfon Cement Plant

Electrical control system for 03 RTG cranes at Chu Lai Port

Project: Design, supply and installation of electrical control system for 03 RTG cranes at Chu Lai Port – Quang Nam Implementation

Inverter 900 Kw for Coal Mill Fans and 548 Kw for Cooler Fans at Chinfon Cement Company – Hai Phong

Project: Design, supply and installation of inverter 900 Kw for Coal Mill Fans and 548 Kw for Cooler Fans at

MV, LV, MV VFD, MV SST cabinet systems and Transformers 12/16MVA và 2500KVA  for the Air Separation Plant (ASU Song Cong)

Project: Design, supply and installation of MV, LV, MV VFD, MV SST cabinet systems and Transformers 12/16MVA và 2500KVA  for

MV, LV cabinet system for Messer Yen Binh ASU plant, Thai Nguyen

Project: Design, supply and installation of MV, LV cabinet system for ASU LOX 6.0 project, Messer Hai Duong Plant Year of

MV soft starter system, MCC – Messer Long An Factory

Project: Design, supply and installation of Solcon medium-voltage soft starter system; MCC 0.4KV 6300A 100kA (Type test; Siemens Sivacon 8PT

DCS distributed control system – Vicem Song Thao cement company

Project: Supply, installation and technical services to replace and upgrade the DCS system – Vicem Song Thao Cement Joint Stock

Belt weighing systems for the mixing area and sintering station 3 at Hoa Phat Hai Duong Steel plant

Project: Supply and installation of 04 belt weighing systems for the mixing area and sintering station 3 – Hoa Phat

© Copyright 2003-2022 - Công ty CP TMKT Hải Anh - Hai Anh JSC, Địa chỉ: P301, D5C, đường Trần Thái Tông, phường Cầu Giấy, TP. Hà Nội, Việt Nam | ĐT: (+84-24) 6269 7755 | Fax: (+84-24) 6269 5556

Chạm để gọi