TYPICAL PROJECTS

Medium voltage inverter system – Messer Thai Nguyen industrial gases plant

Design, supply and install medium voltage inverter system for 9.6MV motor – Messer Thai Nguyen industrial gases plant – 2022

Expansion IO cabinets for DCS system – Nui Phao Thai Nguyen mine

Supply and install expansion IO cabinets for DCS system – Nui Phao Thai Nguyen mine – 2022

Conveyor weighing system BW500 – Nghi Son Thermal Power Plant

Supply and install conveyor weighing system BW500 – Nghi Son Thermal Power Plant – 2022

Inspection Service for coal mill – Pha Lai Thermal Power Plant – 2022

Inspection Service for coal mill performed by experts from Metso Outotec – Pha Lai Thermal Power Plant – 2022

Pneumatic control PLC cabinet for blasting machine at Hoa Phat Dung Quat Steel plant

Design, supply and install pneumatic control PLC cabinet for blasting machine at Hoa Phat Dung Quat Steel plant – 2022

Inverter systems S120-315kW – Hoa Phat Hai Duong Steel Joint Stock Company

Design, supply and install 02 inverter systems S120-315kW – Hoa Phat Hai Duong Steel Joint Stock Company – 2022

Medium voltage inverter cabinets for fans at Song Lam Cement plant

Design, supply and install medium voltage inverter cabinets 1000kW for fans at Song Lam Cement plant – 2022

Soft starter system for air compressors at Messer Thai Nguyen Industrial gases Co. Ltd

Project: Supply and install 03 MV soft-starter cabinets for air compressors – Messer Thai Nguyen Industrial gases Co. Ltd Year of

Soft starter system for Messer Dung Quat Industrial gases Co. Ltd

Project: Supplying and install a soft starter system including 01 10KV – 600A  KDM cabinet and 2 separate KDM cabinets

WH7 Loading in site control cabinet for Baria Serece port

Project: Supply and installation of Mechanical drives and WH7 Loading in site control cabinet for Baria Serece port Year of implementation:

Solcon 6KV-250A medium voltage soft starter kits for Ha Lam Coal Joint Stock Company – Vinacomin

Project: Supply 06 OEM Solcon 6KV-250A medium voltage soft starter kits for Ha Lam Coal Joint Stock Company – Vinacomin Year

22/26MVA 22/10kV and 4MVA 10.5/0.4kV transformers

Project: Supply and installation of 22/26MVA 22/10kV and 4MVA 10.5/0.4kV transformers – Messer Hai Phong Industrial Gas Company – Thai

Controlling system, drive transmission for coal loading crane No. 4, 5 – Pha Lai Thermal Power plant

Project name: Repairing and upgrading control electrical system and engine for coal loading cranes No. 4 and 5 – Pha

Centrifuge control inverter cabinet – Quang Ngai Sugar Joint Stock Company

Project name:  Supply, improve and upgrade the capacity of the inverter control cabinet for the centrifuge A XG-1750 AT G7.2 7

© Copyright 2003-2022 - Công ty CP TMKT Hải Anh - Hai Anh JSC, Địa chỉ: P301, Nhà D5C, đường Trần Thái Tông, Q.Cầu Giấy, TP. Hà Nội, Việt Nam | ĐT: (+84-24) 6269 7755 | Fax: (+84-24) 6269 5556

Chạm để gọi