TYPICAL PROJECTS

Outdoor lighting and electrical control system at Thai Binh Thermal Power Plant

Project: Supply, construction and installation of outdoor lighting electrical system and control electrical system connecting the head building to the

Medium voltage inverter cabinet for cement grinding fan motor – Vissai Ha Nam Cement Factory

Project: Supply and install Siemens medium voltage inverter system to control DC1 cement grinding fan at Vissai Ha Nam Cement

DCS control system for cement production line – INSEE Cement Plant (Holcim cement)

Project: Upgrading, replacing, programming DCS control system for Cement mill & Jetti line from DCS ABB 450AC system to 800xA

Medium voltage inverter system – Messer Thai Nguyen industrial gases plant

Design, supply and install medium voltage inverter system for 9.6MV motor – Messer Thai Nguyen industrial gases plant – 2022

Expansion IO cabinets for DCS system – Nui Phao Thai Nguyen mine

Supply and install expansion IO cabinets for DCS system – Nui Phao Thai Nguyen mine – 2022

Conveyor weighing system BW500 – Nghi Son Thermal Power Plant

Supply and install conveyor weighing system BW500 – Nghi Son Thermal Power Plant – 2022

Inspection Service for coal mill – Pha Lai Thermal Power Plant – 2022

Inspection Service for coal mill performed by experts from Metso Outotec – Pha Lai Thermal Power Plant – 2022

Pneumatic control PLC cabinet for blasting machine at Hoa Phat Dung Quat Steel plant

Design, supply and install pneumatic control PLC cabinet for blasting machine at Hoa Phat Dung Quat Steel plant – 2022

Inverter systems S120-315kW – Hoa Phat Hai Duong Steel Joint Stock Company

Design, supply and install 02 inverter systems S120-315kW – Hoa Phat Hai Duong Steel Joint Stock Company – 2022

Medium voltage inverter cabinets for fans at Song Lam Cement plant

Design, supply and install medium voltage inverter cabinets 1000kW for fans at Song Lam Cement plant – 2022

Soft starter system for air compressors at Messer Thai Nguyen Industrial gases Co. Ltd

Project: Supply and install 03 MV soft-starter cabinets for air compressors – Messer Thai Nguyen Industrial gases Co. Ltd Year of

Soft starter system for Messer Dung Quat Industrial gases Co. Ltd

Project: Supplying and install a soft starter system including 01 10KV – 600A  KDM cabinet and 2 separate KDM cabinets

WH7 Loading in site control cabinet for Baria Serece port

Project: Supply and installation of Mechanical drives and WH7 Loading in site control cabinet for Baria Serece port Year of implementation:

Solcon 6KV-250A medium voltage soft starter kits for Ha Lam Coal Joint Stock Company – Vinacomin

Project: Supply 06 OEM Solcon 6KV-250A medium voltage soft starter kits for Ha Lam Coal Joint Stock Company – Vinacomin Year