- NVCHARGE SOLUTION FOR ELECTRIC VEHICLES
- DANFOSS
- RENEWABLE ENERGY
- INTERGRATED SOLUTIONS
- Medium and low voltage inverter system
- Conveyor Weighing System
- Automatic transfer switch system - ATS
- Motor control center system - MCC
- Distributed Control System - DCS
- PLC - SCADA control system
- TPS control system
- Online coal analyzer and monitor system
- MV and LV soft start system
- UPS system
- MDB & DB distribution cabinets, power supply cabinets
- MARECHAL - TECHNOR
- BORRI
- FLENDER
- DURAG
- SOLCON
- SIEMENS
- METSO OUTOTEC
- TECHNICAL SERVICE
CONTACT
HAI ANH JSC
Email: info@haianhjsc.vn / haianhjsc@hn.vnn.vn
Website: haianhjsc.vn
Fanpage: www.facebook.com/haianhjsc.vn
Linkedin: www.linkedin.com/company/hai-anh-jscHead office in Hanoi:
+ Address: Room 301, D5C Building, Tran Thai Tong street, Cau Giay district, Hanoi, Vietnam
+ Tel: (+84-24) 6269 7755
+ Fax: (+84-24) 6269 5556Nova Energy hi-tech production and research center
Lot CN1-12B – 1.3, Hi-tech Park 1, Hoa Lac Hi-Tech Park, Thach That District, Hanoi, Vietnam
Tel: (+84-24) 3202 2677Central Branch:
Room 1109, Building A, Tecco Towers Apartment – Lot CC2, Resettlement Urban Area East – West Ring Road, Dong Ve ward, Thanh Hoa City, Vietnam
+ Tel: (+84-23) 7383 8886Southern Branch:
+ Address: Floor 1, Gia Thy Building, 158 – 158A Dao Duy Anh, Ward 9, Phu Nhuan district, Ho Chi Minh city, Vietnam
+ Tel: (+84-28) 3517 8949
+ Fax: (+84-28) 3517 8950<b>Head office:
+ Tel: (+84-24) 6269 7755
+ Fax: (+84-24) 6269 5556
+ Email: info@haianhjsc.vn;
HCMC branch:
+ Tel: (+84-28) 3517 8949
+ Fax: (+84-28) 3517 8950
+ Email: info@haianhjsc.vn<b>-
NVCharge electric vehicle charging solution at VCAE EXPO 2025
-
Nova Energy Strategically Cooperates with ETS to Develop Electric Vehicle Charging Infrastructure
-
Impurity separation system – Vinh Tan 4 Thermal Power Plant
-
Control system for marine engines
-
Inverter for coal grinding and material grinding fan system at Chinfon Cement Plant
Product Categories
News
TYPICAL PROJECTS

22/26MVA 22/10kV and 4MVA 10.5/0.4kV transformers
Project: Supply and installation of 22/26MVA 22/10kV and 4MVA 10.5/0.4kV transformers – Messer Hai Phong Industrial Gas Company – Thai

Controlling system, drive transmission for coal loading crane No. 4, 5 – Pha Lai Thermal Power plant
Project name: Repairing and upgrading control electrical system and engine for coal loading cranes No. 4 and 5 – Pha

Centrifuge control inverter cabinet – Quang Ngai Sugar Joint Stock Company
Project name: Supply, improve and upgrade the capacity of the inverter control cabinet for the centrifuge A XG-1750 AT G7.2 7

Technical services: comprehensive maintenance and servicing for the soft start system at Hoa Phat Dung Quat Steel Company
Implementation content: Comprehensive maintenance and servicing for the system of 12 Solcon 10kV medium voltage soft starter electrical cabinets.Analyze, evaluate,

Control cabinet for boiler system – Phu My 3 thermal power company
Design, supply and install control cabinet for boiler system – Phu My 3 thermal power company – 2021

Online coal parameter monitoring system at Vinh Tan 2 Thermal Power Plant
Project: Supply and install an online coal parameter monitoring system at Vinh Tan 2 Thermal Power Plant – Binh Thuan

MDB power supply cabinet system – BARIA SERECE Joint Stock Company of services for import export of argo forestry products and fertilizers
Project name: Supply and install, electrical connection for MDB power supply cabinet system – BARIA SERECE Joint Stock Company of

Equipment for improving the flaps of the Stacker Reclaimer at Vinh Tan 2 Thermal Power Plant
Project name: Supply and installation of equipment to improve the flip of Stacker Reclaimer at Vinh Tan 2 Thermal Power

Automatic residue weighing system (conveyor scale), SCADA at An Khe Biomass Power Plant
Project name: Supply and installation of automatic residue weighing system (conveyor scale) and SCADA monitoring system at An Khe Biomass

Solcon soft starter cabinet 6kW – 140A at Khanh Hoa Coal Company
Project name: Supply and install 2 Solcon 6kW – 140A soft starter cabinets at Khanh Hoa Coal Company – Thai

Conveyor weighing system C4C, SCADA at Vinh Tan 2 Thermal Power Plant
Project name: Supply and install C4C conveyor weighing system and upgrade SCADA system, update C4C conveyor weighing database for Vinh

Successfully implemented online factory acceptance test (Online FAT) for the project: Supply, design, install control system for water supply and drainage system and HVAC at Long Son petrochemical complex
In the complicated situation of the COVID-19 pandemic, in the spirit of determination to meet the strict schedule, quality and

Control system for water supply and drainage system and HVAC at Long Son Refinery and Petrochemical Plant
Project name: Supply, design, install control system for water supply and drainage system and HVAC at Long Son Refinery and

Conveyor weighing system at Hoa Phat Dung Quat Steel Company
Project name: Supply, design, installation and calibration of conveyor weighing system at Hoa Phat Dung Quat Steel Company Year of
- NVCHARGE SOLUTION FOR ELECTRIC VEHICLES
- DANFOSS
- RENEWABLE ENERGY
- INTERGRATED SOLUTIONS
- Medium and low voltage inverter system
- Conveyor Weighing System
- Automatic transfer switch system - ATS
- Motor control center system - MCC
- Distributed Control System - DCS
- PLC - SCADA control system
- TPS control system
- Online coal analyzer and monitor system
- MV and LV soft start system
- UPS system
- MDB & DB distribution cabinets, power supply cabinets
- MARECHAL - TECHNOR
- BORRI
- FLENDER
- DURAG
- SOLCON
- SIEMENS
- METSO OUTOTEC
- TECHNICAL SERVICE
CONTACT
HAI ANH JSC
Email: info@haianhjsc.vn / haianhjsc@hn.vnn.vn
Website: haianhjsc.vn
Fanpage: www.facebook.com/haianhjsc.vn
Linkedin: www.linkedin.com/company/hai-anh-jscHead office in Hanoi:
+ Address: Room 301, D5C Building, Tran Thai Tong street, Cau Giay district, Hanoi, Vietnam
+ Tel: (+84-24) 6269 7755
+ Fax: (+84-24) 6269 5556Nova Energy hi-tech production and research center
Lot CN1-12B – 1.3, Hi-tech Park 1, Hoa Lac Hi-Tech Park, Thach That District, Hanoi, Vietnam
Tel: (+84-24) 3202 2677Central Branch:
Room 1109, Building A, Tecco Towers Apartment – Lot CC2, Resettlement Urban Area East – West Ring Road, Dong Ve ward, Thanh Hoa City, Vietnam
+ Tel: (+84-23) 7383 8886Southern Branch:
+ Address: Floor 1, Gia Thy Building, 158 – 158A Dao Duy Anh, Ward 9, Phu Nhuan district, Ho Chi Minh city, Vietnam
+ Tel: (+84-28) 3517 8949
+ Fax: (+84-28) 3517 8950<b>Head office:
+ Tel: (+84-24) 6269 7755
+ Fax: (+84-24) 6269 5556
+ Email: info@haianhjsc.vn;
HCMC branch:
+ Tel: (+84-28) 3517 8949
+ Fax: (+84-28) 3517 8950
+ Email: info@haianhjsc.vn<b>-
NVCharge electric vehicle charging solution at VCAE EXPO 2025
-
Nova Energy Strategically Cooperates with ETS to Develop Electric Vehicle Charging Infrastructure
-
Impurity separation system – Vinh Tan 4 Thermal Power Plant
-
Control system for marine engines
-
Inverter for coal grinding and material grinding fan system at Chinfon Cement Plant