- NVCHARGE SOLUTION FOR ELECTRIC VEHICLES
- DANFOSS
- RENEWABLE ENERGY
- INTERGRATED SOLUTIONS
- Medium and low voltage inverter system
- Conveyor Weighing System
- Automatic transfer switch system - ATS
- Motor control center system - MCC
- Distributed Control System - DCS
- PLC - SCADA control system
- TPS control system
- Online coal analyzer and monitor system
- MV and LV soft start system
- UPS system
- MDB & DB distribution cabinets, power supply cabinets
- MARECHAL - TECHNOR
- BORRI
- FLENDER
- DURAG
- SOLCON
- SIEMENS
- METSO OUTOTEC
- TECHNICAL SERVICE
CONTACT
HAI ANH JSC
Email: info@haianhjsc.vn / haianhjsc@hn.vnn.vn
Website: haianhjsc.vn
Fanpage: www.facebook.com/haianhjsc.vn
Linkedin: www.linkedin.com/company/hai-anh-jsc Head office in Hanoi city:
+ Address: Room 301, D5C Building, Tran Thai Tong street, Cau Giay ward, Hanoi, Vietnam
+ Tel: (+84-24) 6269 7755
+ Fax: (+84-24) 6269 5556 Nova Energy hi-tech production and research center
Lot CN1-12B – 1.3, Hi-tech Park 1, Hoa Lac Hi-Tech Park, Ha Bang commune, Hanoi, Vietnam
Tel: (+84-24) 3202 2677 Central Branch:
Room 1109, Building A, Tecco Dong Ve Towers Apartment, Hac Thanh ward, Thanh Hoa City, Vietnam
Tel: (+84-23) 7383 8886 Southern Branch:
+ Address: Floor 1, Gia Thy Building, 158 Dao Duy Anh, Duc Nhuan ward, HCM city, Vietnam
+ Tel: (+84-28) 3517 8949
+ Fax: (+84-28) 3517 8950-
External Network Metering System – Hoa Phat Dung Quat 2 Project
-
Medium Voltage Switchgear System at Hoang Mai Cement
-
Electrical and Control System for HPS2 Phong Dien Plant
-
Compressed Air Station Electrical System – Hoa Phat Dung Quat 1 Thermal Power Plant
-
Hai Anh JSC and VINALIFT Sign Strategic Partnership Agreement with Global Technology Partners: Siemens, Innomotics, Flender
Product Categories
News
TYPICAL PROJECTS
Conveyor weighing system C4C, SCADA at Vinh Tan 2 Thermal Power Plant
Project name: Supply and install C4C conveyor weighing system and upgrade SCADA system, update C4C conveyor weighing database for Vinh
Successfully implemented online factory acceptance test (Online FAT) for the project: Supply, design, install control system for water supply and drainage system and HVAC at Long Son petrochemical complex
In the complicated situation of the COVID-19 pandemic, in the spirit of determination to meet the strict schedule, quality and
Control system for water supply and drainage system and HVAC at Long Son Refinery and Petrochemical Plant
Project name: Supply, design, install control system for water supply and drainage system and HVAC at Long Son Refinery and
Conveyor weighing system at Hoa Phat Dung Quat Steel Company
Project name: Supply, design, installation and calibration of conveyor weighing system at Hoa Phat Dung Quat Steel Company Year of
Online coal calorific monitoring equipment and conveyor scales for Mong Duong Thermal Power Company
Project name: Design, supply and installation of online coal calorific monitoring equipment and conveyor scales for Mong Duong Thermal Power
ECS control system and VRV and PAC distribution system at elevated railway stations – Colas Rail Joint Stock Company
Project: Design, supply, complete installation of ECS control system and VRV and PAC distribution system at elevated railway stations –
63MVA transformer for 35KV station at Hoa Phat Steel Company – Hai Duong
Project: Supply and complete installation of 63MVA transformer at Hoa Phat Steel Company – Hai Duong. Year of implementation: 2020 Main equipment:
Inverter system to control the fan station at Ha Long Coal Company – TKV
Project name: Supply and installation of fan station No. 2 at site +115 at Ha Long Coal Company – TKV Year
(Tiếng Việt) Trạm hợp bộ biến tần, điều khiển tại Nhà máy điện mặt trời Tuy Phong
Sorry, this entry is only available in Vietnamese.
(Tiếng Việt) Hệ thống khởi động mềm điều khiển quạt hệ thống khử lưu huỳnh tại công ty CP Thép Hòa Phát Hải Dương
Sorry, this entry is only available in Vietnamese.
(Tiếng Việt) Hệ thống điện phân phối nguồn cho kho 10AB và 10CD Cảng Phú Mỹ – Bà Rịa Vũng Tàu
Sorry, this entry is only available in Vietnamese.
(Tiếng Việt) Hệ thống biến tần Siemens điều khiển trạm bơm nước đúc – Khu liên hợp sản xuất thép Hòa Phát – Hải Dương
Sorry, this entry is only available in Vietnamese.
(Tiếng Việt) Hệ thống TPS điều khiển cho hệ thống sấy khí dây chuyền 2 – Nhà máy khí Messer Hải Dương
Sorry, this entry is only available in Vietnamese.
(Tiếng Việt) Hệ thống điện điều khiển cho hệ thống Cooling Water tại Nhiệt điện Phú Mỹ 3
Sorry, this entry is only available in Vietnamese.
- NVCHARGE SOLUTION FOR ELECTRIC VEHICLES
- DANFOSS
- RENEWABLE ENERGY
- INTERGRATED SOLUTIONS
- Medium and low voltage inverter system
- Conveyor Weighing System
- Automatic transfer switch system - ATS
- Motor control center system - MCC
- Distributed Control System - DCS
- PLC - SCADA control system
- TPS control system
- Online coal analyzer and monitor system
- MV and LV soft start system
- UPS system
- MDB & DB distribution cabinets, power supply cabinets
- MARECHAL - TECHNOR
- BORRI
- FLENDER
- DURAG
- SOLCON
- SIEMENS
- METSO OUTOTEC
- TECHNICAL SERVICE
CONTACT
HAI ANH JSC
Email: info@haianhjsc.vn / haianhjsc@hn.vnn.vn
Website: haianhjsc.vn
Fanpage: www.facebook.com/haianhjsc.vn
Linkedin: www.linkedin.com/company/hai-anh-jsc Head office in Hanoi city:
+ Address: Room 301, D5C Building, Tran Thai Tong street, Cau Giay ward, Hanoi, Vietnam
+ Tel: (+84-24) 6269 7755
+ Fax: (+84-24) 6269 5556 Nova Energy hi-tech production and research center
Lot CN1-12B – 1.3, Hi-tech Park 1, Hoa Lac Hi-Tech Park, Ha Bang commune, Hanoi, Vietnam
Tel: (+84-24) 3202 2677 Central Branch:
Room 1109, Building A, Tecco Dong Ve Towers Apartment, Hac Thanh ward, Thanh Hoa City, Vietnam
Tel: (+84-23) 7383 8886 Southern Branch:
+ Address: Floor 1, Gia Thy Building, 158 Dao Duy Anh, Duc Nhuan ward, HCM city, Vietnam
+ Tel: (+84-28) 3517 8949
+ Fax: (+84-28) 3517 8950-
External Network Metering System – Hoa Phat Dung Quat 2 Project
-
Medium Voltage Switchgear System at Hoang Mai Cement
-
Electrical and Control System for HPS2 Phong Dien Plant
-
Compressed Air Station Electrical System – Hoa Phat Dung Quat 1 Thermal Power Plant
-
Hai Anh JSC and VINALIFT Sign Strategic Partnership Agreement with Global Technology Partners: Siemens, Innomotics, Flender